Thursday, December 3, 2009

What Is Bad About Loceryl

pain ... Make it your project!

We now are a regular customer at the hardware store and be recognized at the checkout. Linda constantly dragged out tons of material there, and everything has to be processed. All ceilings, walls and floors must be designed. The question "and what you do so today?" Has done so for us. Until New Year's Eve, I know now for what I do every day - the chef has crafted a beautiful clear plan.

But we have also done quite a few tasks: The kitchen is papered with fleece and waiting for the paint. Since the kitchen studio at 16.12. want to build, we have some motivation here on time be. The pantry was removed at the weekend - Taffy has operated, and Sven has actively supported. Meanwhile, we have refined our bedroom with painter fleece. To effectively leveled walls but convincing to get smooth, we have decided to to pantry and utility room anywhere to put fleece on the walls and ceiling. Sporty but certainly worth the effort.

tapez

ceilings §&%&**!

tapez2

As you can see, all you see. After the primer is the second round without visible success.

The external helpers have also come forward significantly. Our bathrooms are nearing completion - at least from the perspective of the tile layer.

baddg

Bad DG

baddg2

Links loo, bidet right. Finally, we have

still waiting for a backordered package wall tiles at the weekend but can now be processed. Since toilets are installed & Co. - except for above the sink's all there.

gbad

guest

gba2d

The floor to ceiling shower.

EBH apparently has a few more sites on the plan - the schedule is sometimes adventurous. But winter is approaching and our little terrace debacle has so far held up everything a bit. But that should now be done - as far as I have heard it was again closed and sealed. The electricians were busy this week, almost every day and have installed all the sockets and switches. Unbelievable how many cables come together in HWR. Since yesterday we have light - ie light bulbs everywhere that respond to switch. This will greatly facilitate the decorating work :-)

heizer

The yellow mini-power plant heats the ceiling above the terrace

The exterior plaster was unfortunately closed due to the terrace and slowly EBH is also skeptical about whether it still makes sense this year. For me, not the end - I think the boss is suboptimal but it is also not change it. Maybe the weather is still time. Our fence project is unfortunately. First, we have to do just enough inside, on the other hand, the trench not solidified because of the moisture so far been. The pigs are doing well and all the other forest animals to feel comfortable with us.

Our heating is now running again - the ventilation is probably always activated only at the end I have learned. In between times we had a sauna. The heating engineer has ignored the statement by EBH and the Screed program started. But we have no floor, so we were free grilled. After we felt at 30 degrees had wallpapered the kitchen was then turned off at first, to end the program. Do we know at least at the two extreme variants.

Next week I have four day office - then I have "holiday". At the moment we are waiting for the departure of the cleaning crew from our living room, also there to start with the wall design can. Until then, we pass the time in the guest room and dressing room. "We nonwovens" ... pun. On Saturday, he gets a new challenge to this - we tile ... for real. We practice again in the Pantry but have a coach from my home (thanks dad) can fly. With these instructions, it should be possible. Hopefully, because a week later we have to complete the kitchen.

flurfliese

oh yes - the floor is still to be done ...

Enough so - if you've got time boredom and want to train your arm muscles. ...