Wednesday, January 6, 2010

15 Dresses How Much Do They Cost

On a Happy New Year

First, all readers, relatives, acquaintances and even total strangers a healthy and successful 2010. I hope you all had a good clean - we are. Since the last review we have worked tirelessly walls, floors and ceilings. Always the New Year's Eve celebration in mind, we have tried everything to get so far that people can stay here and celebrate. After an incredible battle of material and 14 - 16 hour days, we came first Christmas in between.

tape1

tape2

After all we had until then been a kitchen - I took pictures not specifically - but there are a few pictures in the background where you guessed a kitchen.

kueche1

kueche2

kueche3

Just before Christmas (on 23.12.) Came our living room carpet - he carried straight through the garden.

teppich1

We already have our pre-tiled dining room - now completely without outside help. You learn something.

flie1

flie2

However, it still looked on at delivery to the following:

teppich2

At Christmas we have done two days on which we have visited our loved ones. Just in time for 26.12. But then we had to do more - after the car was moving at 28 ordered. The carpet still had to be glued together and moved elsewhere and the house was at that time still a big construction site. So even fix two days dragged by and on 27 times make only half a day - after all we had to pack. So we came up 21 clock in our home and so had less time to pack our entire household, as we have previously indulged for packing suitcases on holiday. Four hours later, however, was the most in boxes and so could it go on promptly at seven. And it went surprisingly well - despite sleet. Thanks to great support from family and Taffy from V. P. of H. was on the evening of an apartment pretty empty and our house filled to the brim with any boxes or cabinets. Incredibly, what so everything fits in a flat. When we woke up the next morning, was the realization that we now have 2.5 days to produce any order - after we could no longer resort to the apartment and two young children together with parents to sleep somewhere, showers, party ... so full throttle and above all, priorities. Our material we had already trimmed a few days earlier - here we could only cover fleece cover. For example, Linda has made the move in mind, first floor of our hotel room while I carried the first box through the house. Always true to the motto - is there anywhere better than here. The next day, Linda will have added yet gemalert fix the guest bathroom - the bathroom we had not even touched so far. Here come our basin to the large bathroom no longer would we have left completely out of it. A Bad enough finally - yes, anything goes. I have to, meanwhile, dropped to the floor boards and distributed switches and sockets, so that we could at least move the cabinets to the walls. At last, fast into the night with a pimped up the hallway floor - after all, we wanted to unpack the stairs and finally it must be able to move around without shoes in the house.

New Year's Eve - at seven:

silvester1

As you see, was something to do then good. Linda has made the by she started at a run to rush through the booth. I found funny. Freizubekommen times around the head and our guests to bring a sensible arrival, I've just notched a snowy road in our plot to push. Wei is seen that was necessary, even if our short-distance sprinter'm not really excited looked as if I, after a brief chat with the neighbors again knocked on the door.

schnee

And yet - in time by 14 clock pushed the first car in the driveway and we had become really ready. Well - I just had to plow a small area with a vacuum cleaner.

phillip

On arrival, we have distributed lamps had to be screwed. Granted - some improvised easily, but then we could start with our friends in the new year. It was great - and we have persevered even to twelve or more.

Both the first and the second in January then the rest was dedicated. Freed from the pressure to have to make sure something done, we spent two days on the sofa and the snow falling from the sky watching. More, there was initially not seen since our satellite system refused the service. Instructed by EBH colleagues have probably thought of as a tree makes the receiving nothing. However, one must say also that we visited the EBH electrician on the day before Christmas, personally to our stainless steel switch (!) To install. On that occasion he has the satellite issue also looked at and did not really know what to make of it. If you do it you yourself;). He promised a solution soon as the weather gets better. We have now taken on a transitional basis DVB-T antenna, which works great - you should look here for new buildings in the area in each case as an alternative.

While we're at EBH - after the final house delivery, all outstanding work done really fast. Thus came the morning DAB car number one on the court - straightened ne fix our garden wall and retrofitted water meters. A team went back from the farm - half an hour later the next car came with the Treppenspezi one of something still stopped and optimized other small items. We also learned that EBH was probably in full stress, as well as builders who built in December before Christmas want to move - sports. Apart from the outer wall is now not much open. As our experts had to come twice because of the terrace, we have provided a friendly but insistent request to the Board to take the extra cost. Two minutes, the commitment was for it - thank you. I am aware that this is pure grace, and even if I our case for more than convincing think, I appreciate that. I am getting carried away again for a longer conclusion but first let me say that we are very satisfied. It is certainly not build a house without a minor or major disasters but I have the feeling that few things have gone really wrong. And even then it all depends on the behavior of the company then. Because I know that DAB sometimes also the link to potential customers is still the offer that you can not hesitate to contact us personally if you have specific questions about it. If it just fits securely and is a small sightseeing nothing in the way - this is obviously not offer the new EBH model house to be. However, I have in the run-after information about the company and former owners searched the internet and found not much. That is why this blog. Which, moreover, continue - eventually will have enough to do. So - up soon.

IMG_0304

0 comments:

Post a Comment