Our current project goal for the fall. Necessary for this are path and terrace project with input range. Much of the preparation for the most part was supplied by Papa has characterized the past few weeks. We have in addition to other garden projects mainly created a little space to store all our building materials. All things that arises in the garden and landscaping.

Last Monday was but the beginning of operations for the "Terrace" and the whole week should be well used. First step footings for the columns of the substructure. A terrace of 50 m² + input is 120 to drilling holes, concrete foundations, columns tinker and 100 meters under construction timber.

ter1 ter2

ter3 ter4

The work dragged on for several days and as you can see below, gives us all what he can do well :-)

ter5 ter6

Eventually, each hole was drilled, filled and made every post and put. We were supported here by the local hardware stores, wood and steel market market Potsdam Potsdam - against appropriate payment, of course.

ter7 ter8

alongside One of the ongoing projects is still the color beautification of our log cabin. Linda here has toiled mostly in the past few weeks and today we were finally able to finish.

haus2 haus1

We must soon be time to create a clean entrance way but one by one. Our first bed on the property today was packed into mulch. Looks nice and should hopefully away a little weed.

beet2

Also our zoo thinks We provide almost every day for a surprise. For the fans here are some highlights:

bock rehfamily

rehfamily2

Juhu - new young wild boar with an extra big mama.

sau family

sau

morning I finally allowed back into office!