Hello readers,
came on Friday as the agreed ceiling for the EC. The client had indeed taken extra free to make many many pictures. This has unfortunately did not work out so well.
When we arrived around 9:00 h on the site, the crane is just left again. The breakfast lasted much longer than usual (Hannah was so cozy), so that we could not go past (well wanted to, rather). Well, at least the ceiling was on the we were able to make a first impression how the rooms appear now in the closed state. Strangely, they seem bigger to me than without the blanket. The assembly of the elements were not the way of Schalkoholz, but by the Baumontage GmbH Ulf Otte from Odderade, probably a sub von Zerssen / Schalk wood.
in the living room we discovered that accumulates during a ceiling element, the wall has shifted slightly to the double window and a stone was broken. This deficiency was corrected immediately, however. Other deficiencies could not find us.
| |
| deficiency before defect corrected |
According to the technicians should then be poured around 14:00 h of the concrete. So the client then has again at 14:00 on his way to finally get some cool pictures .. but Nope. When I was about 14:15 h on the building site, concrete mixers and workers were already gone. Again, no action shots. Well, at least everything was ready and saw (if visible) good too.
is now between 01 Next and 05.11. The roof will be addressed. Get the daily times the carpenters call to arrange an appointment for the ceremony.
ALTHOUGH can not take action shots, but of course a couple of "Still Life":
| |
| south |
| |
| East |
| |
| East |
| |
| West |
| |
| West |
| |
| north entrance |
| |
| kitchen and pantry |