Fantastic beach house in the Caribbean
This 8-room house is located in Cabarete, Puerto Plata . Beside the pool, the property also has air conditioning, fitted kitchens and all necessary appliances (all included in price).
The location is absolutely fantastic - the house is located in a quiet street right on the beach . Both from within and from the terraces of the fantastic sea views or romantic winter sun can be found.
Further data on beach house in the Caribbean :
Purchase Price: 234,000.00 EUR
Rooms: 8.00
Liveable: 190,00 m²
Land area approximately: 993.00 m²
Bedrooms: 4 Bathrooms
: 3
Vacant from: Now you look
other properties in the Caribbean Sea View ?
[Bild-/Infoquelle: immobilienscout24.de]
Sunday, January 30, 2011
Brent Corrigan Brent Everett Movies
laid carpet and final sprint!
The carpet was laid on Friday by the company Saré and gives the floor is now a completely different look. Similarly, in the week set up the partition wall in the bedroom and installed the sanitary objects. A "wow" effect we saw when looking into the utility room and the controlled ventilation system ... (See photo)
And now comes the final sprint of the building - a preliminary takeover next week, then have the craftsmen two weeks to unfinished matters and eliminate defects and the major decrease for 17 :-) Dated February
| |
| bathroom sanitary ware |
|
| Geiles piece of technology in the HWR =) |
|
| laid carpet |
|
| wall in the bedroom including TV connection ;-) |
|
| party balcony |
|
| look slow construction by |
Saturday, January 29, 2011
Braided Leather Bracelet Wholesale
Can B50 Help You Lose Weight
house connections ready ...
Hello readers,
Thursday was in our power, water and telephone set into the house. This has geplappt really good, we made it before the next frost.
We took care of it myself, the earth works to bring out such a little time. Fischer, who has moved on this day, the rain and sewage connections, has for us is the trenches for the House connections are made.
The coordination has worked out great and we were now completely self-sufficient, yet lacking the electric meter and water meter. This will be installed next week and we can finally connect the dehumidifier. Then the two shafts of the transfer from Fischer to be installed. But the ground was frozen too hard on Friday, so we hope to return to milder weather ...
Hello readers,
Thursday was in our power, water and telephone set into the house. This has geplappt really good, we made it before the next frost.
| |
| house feed electricity, water and telephone |
We took care of it myself, the earth works to bring out such a little time. Fischer, who has moved on this day, the rain and sewage connections, has for us is the trenches for the House connections are made.
The coordination has worked out great and we were now completely self-sufficient, yet lacking the electric meter and water meter. This will be installed next week and we can finally connect the dehumidifier. Then the two shafts of the transfer from Fischer to be installed. But the ground was frozen too hard on Friday, so we hope to return to milder weather ...
Friday, January 21, 2011
Marg Helgenbergerplastic Surgery
screed in there ... (Picture Update 23.01.)
Hello readers,
on Thursday was as expected, the screed is poured. Since this now is to rest first 3 days, unfortunately there are still photos. But I could still make the morning a few quick pictures of the FBH.
addition we received the good news that will be made next Thursday the house connections. Then we have electricity and water in the house and are no longer dependent on the weather.
the weekend, the client will delete the roof shelters, Mr. Koop was able to ensure that the scaffolding is removed next week, very nice ... so no long ladder necessary.
And here are the first pictures of the screed:
is
Hello readers,
on Thursday was as expected, the screed is poured. Since this now is to rest first 3 days, unfortunately there are still photos. But I could still make the morning a few quick pictures of the FBH.
| |
| kitchen |
| |
| dining |
| |
| guest bathroom |
| |
| corridor |
| |
| Our case with opening pipes were also installed. |
addition we received the good news that will be made next Thursday the house connections. Then we have electricity and water in the house and are no longer dependent on the weather.
the weekend, the client will delete the roof shelters, Mr. Koop was able to ensure that the scaffolding is removed next week, very nice ... so no long ladder necessary.
And here are the first pictures of the screed:
is
Tuesday, January 18, 2011
How To Masterbate Long For Women
We present ...
... :-)
our kitchen was delivered today our kitchen by hackers Systemat Rosenowski kitchens and mounted.
... :-)
our kitchen was delivered today our kitchen by hackers Systemat Rosenowski kitchens and mounted.
Monday, January 17, 2011
Rhyming Animal Sayings
The screed is coming ...!
Hello readers,
at the moment it from our site in rapid succession.
On Friday and Saturday have grouted grouting our house. Except for the downpipes from outside our house is now finished, yay! The developer would actually have to cut the WE the roof blows, but lay in bed with a thick cold. Since the end of next week the scaffolding is removed, I have to get well soon a long ladder ...
were in the last week, the nice guys of the company Gruenwald at the construction site and have the heating and Sanitärvorinstallation completed. Today, the insulation was installed, Wednesday the heating loops are installed for the FBH and Thursday is the screed. The last major milestone is within sight. After consultation with the public utilities can probably even the house connections are made on time.
We were so named because of the winter backlog indefinitely no date, but because the building owner is a great woman, but could not reach you, we not later than 15.02. be connected, perhaps even earlier. This provides the Auheizprogramm meht nothing in the way.
The site is now that we have not criticized Mr. Koop, again very clean. All trades have picked up their rubbish. Mr. Koop is really great!
Some advice on its own behalf. The developer has since the beginning of a new job and no longer finds the time to write every day in his diary. I will try to continue to make this regularly, it can not promise though.
Hello readers,
at the moment it from our site in rapid succession.
On Friday and Saturday have grouted grouting our house. Except for the downpipes from outside our house is now finished, yay! The developer would actually have to cut the WE the roof blows, but lay in bed with a thick cold. Since the end of next week the scaffolding is removed, I have to get well soon a long ladder ...
were in the last week, the nice guys of the company Gruenwald at the construction site and have the heating and Sanitärvorinstallation completed. Today, the insulation was installed, Wednesday the heating loops are installed for the FBH and Thursday is the screed. The last major milestone is within sight. After consultation with the public utilities can probably even the house connections are made on time.
We were so named because of the winter backlog indefinitely no date, but because the building owner is a great woman, but could not reach you, we not later than 15.02. be connected, perhaps even earlier. This provides the Auheizprogramm meht nothing in the way.
The site is now that we have not criticized Mr. Koop, again very clean. All trades have picked up their rubbish. Mr. Koop is really great!
Some advice on its own behalf. The developer has since the beginning of a new job and no longer finds the time to write every day in his diary. I will try to continue to make this regularly, it can not promise though.
Tuesday, January 11, 2011
Requesting Letter For Telephone Disconnect
bore BHE
Hello readers,
am last night I even passed briefly at the construction site stood there, a big drill. Curious as I am, I am passed away today morning before work again and arrived at the house where two nice workers. These were just the background for the 13t Monster prepare. Today and tomorrow the geothermal probe is drilled, at last! Let's see if I can still take a few pictures.
Then I also found the joints, they want to start this week and still be ready.
It is progressing well ...
Here are some pictures:
Hello readers,
am last night I even passed briefly at the construction site stood there, a big drill. Curious as I am, I am passed away today morning before work again and arrived at the house where two nice workers. These were just the background for the 13t Monster prepare. Today and tomorrow the geothermal probe is drilled, at last! Let's see if I can still take a few pictures.
Then I also found the joints, they want to start this week and still be ready.
It is progressing well ...
Here are some pictures:
Monday, January 10, 2011
Presynaptic Reuptake Of Norepinephrine
window sills
Does anyone need window sills? The
is rampant out there about the scaffolding, and so are not the ones we had chosen. Saturday afternoon we were after the construction inspection at Hanover house and have given notice to Mr. Balzer.
Addendum:
Mr. Balzer seems to have all the levers in motion, it was very quickly delivered the new and correct window sills and cultivated.
Does anyone need window sills? The
is rampant out there about the scaffolding, and so are not the ones we had chosen. Saturday afternoon we were after the construction inspection at Hanover house and have given notice to Mr. Balzer.
Addendum:
Mr. Balzer seems to have all the levers in motion, it was very quickly delivered the new and correct window sills and cultivated.
Sunday, January 9, 2011
Lost Feeling Lower Legs
drywall II, blower door test and outlook
Hello readers,
even if there were a few days late, but we would all also have a happy new year wish!
During this week we worked hard again, the builders were dry on Wednesday and Thursday we have the Sheetrock on walls and ceiling mounted. Wednesday was also the blower door test conducted by us. Sorry we could not be there but Mr. Koop, our construction manager, informed us a value of 1.1. That is probably pretty good if the house is really ready, can also further enhance the value of 0.3.
On the subject of roller shutters and massive Gibelwände. I've read several times that the shutter boxes in houses with non-massive gable walls are not lined with plasterboard (can?) And extend about 5 cm into the room. We've got no gable Massive but our dry farm dam at the time probably thought along, our boxes in the floor are all invisible, super. When friends of ours who have geabut with team are to see this and it shows rather not look so great. So at best before again talking to the Trockbauern ...
jetztein Here some pictures:
With Ergbnis of the drywall, we are not peace to 100%, the gaps between some boards are sometimes quite extreme. As the client on Wednesday morning came to the site, already the first empty beer bottles were in the house. At some points through careless handling of the plates were holes in the plaster, here must be reworked again. As an additional timber battens were used, which was under snow for days and was completely wet. While it was a night warmed by a site heater but I doubt that the woods have become really dry.
Next Wednesday we will meet with Mr. Koop at the house and we will discuss these things. In particular, the Wet wood shall I do. But we also have a few other topics on the docket. Here are the two most important are:
- The site looks like hell, all wood residues, sheet, tiles, etc. are. That did not work.
- As of today, our house connections are not made on time. The Public Utility through the winter have a mega-backwater and we can not name a date. We will now clarify whether we can save time if we forgive the supply ditch alien. Otherwise, everything shifts indefinitely. Without power, no heating and no heating no screed ...
Hello readers,
even if there were a few days late, but we would all also have a happy new year wish!
During this week we worked hard again, the builders were dry on Wednesday and Thursday we have the Sheetrock on walls and ceiling mounted. Wednesday was also the blower door test conducted by us. Sorry we could not be there but Mr. Koop, our construction manager, informed us a value of 1.1. That is probably pretty good if the house is really ready, can also further enhance the value of 0.3.
On the subject of roller shutters and massive Gibelwände. I've read several times that the shutter boxes in houses with non-massive gable walls are not lined with plasterboard (can?) And extend about 5 cm into the room. We've got no gable Massive but our dry farm dam at the time probably thought along, our boxes in the floor are all invisible, super. When friends of ours who have geabut with team are to see this and it shows rather not look so great. So at best before again talking to the Trockbauern ...
jetztein Here some pictures:
| |
| niche for bath |
| |
| niche for WC |
| |
| store |
| |
| children II |
| |
| staircase |
With Ergbnis of the drywall, we are not peace to 100%, the gaps between some boards are sometimes quite extreme. As the client on Wednesday morning came to the site, already the first empty beer bottles were in the house. At some points through careless handling of the plates were holes in the plaster, here must be reworked again. As an additional timber battens were used, which was under snow for days and was completely wet. While it was a night warmed by a site heater but I doubt that the woods have become really dry.
Next Wednesday we will meet with Mr. Koop at the house and we will discuss these things. In particular, the Wet wood shall I do. But we also have a few other topics on the docket. Here are the two most important are:
- The site looks like hell, all wood residues, sheet, tiles, etc. are. That did not work.
- As of today, our house connections are not made on time. The Public Utility through the winter have a mega-backwater and we can not name a date. We will now clarify whether we can save time if we forgive the supply ditch alien. Otherwise, everything shifts indefinitely. Without power, no heating and no heating no screed ...