drywall II, blower door test and outlook

Hello readers,

even if there were a few days late, but we would all also have a happy new year wish!

During this week we worked hard again, the builders were dry on Wednesday and Thursday we have the Sheetrock on walls and ceiling mounted. Wednesday was also the blower door test conducted by us. Sorry we could not be there but Mr. Koop, our construction manager, informed us a value of 1.1. That is probably pretty good if the house is really ready, can also further enhance the value of 0.3.

On the subject of roller shutters and massive Gibelwände. I've read several times that the shutter boxes in houses with non-massive gable walls are not lined with plasterboard (can?) And extend about 5 cm into the room. We've got no gable Massive but our dry farm dam at the time probably thought along, our boxes in the floor are all invisible, super. When friends of ours who have geabut with team are to see this and it shows rather not look so great. So at best before again talking to the Trockbauern ...

jetztein Here some pictures:




niche for bath
niche for WC
store
children II
staircase



With Ergbnis of the drywall, we are not peace to 100%, the gaps between some boards are sometimes quite extreme. As the client on Wednesday morning came to the site, already the first empty beer bottles were in the house. At some points through careless handling of the plates were holes in the plaster, here must be reworked again. As an additional timber battens were used, which was under snow for days and was completely wet. While it was a night warmed by a site heater but I doubt that the woods have become really dry.

Next Wednesday we will meet with Mr. Koop at the house and we will discuss these things. In particular, the Wet wood shall I do. But we also have a few other topics on the docket. Here are the two most important are:

- The site looks like hell, all wood residues, sheet, tiles, etc. are. That did not work.

- As of today, our house connections are not made on time. The Public Utility through the winter have a mega-backwater and we can not name a date. We will now clarify whether we can save time if we forgive the supply ditch alien. Otherwise, everything shifts indefinitely. Without power, no heating and no heating no screed ...