Our dream of building

we have seen last Sunday at random on Vox. What do the people there, delivered in part to work and are exposed to a stress ... incredible ... We are really happy to have come without serious structural defects and very large building Tress through time. dragged
That the building without our nerves to have is of course not true, but that is now gone and we are excited about our new house.
A summary (or Résumé?) With Hanover House, we will write, if the remaining trades (exterior plaster, etc.) are done.
First, we can already say that we are on the whole, but are content. Very pleased we were in the sales and planning phase, where we were accompanied by Mr. and Mrs. Timpson Balzer. Mr. Balzer has sold us useful things in the house (eg blinds and controlled ventilation system) and Ms. Timpe has shown us a very nice floor plan and implement our wishes.
The construction phase with our construction manager, Mr. Schneider was then in part a rollercoaster of emotions - from "Hooray, it precedes" until "Sch ... # *," was all there. We think that it is many developers Sun is delivered, after all investing a lot of money here and there and if something goes wrong, then the nerves are quickly blank ... At the end of the construction phase (and after a clarifying interview with Hanover House), the communications are better and there was building also fun again. We are preparing for the moment the evaluation of individual crafts / trades and then elaborate on the positive and negative trades.
house delivery: This objective was sober, it was written down the remaining tasks and complaints, they were executed on the specified dates. An introduction to the building services (heating and ventilation), we got through the plumbing and so was passing the house.
actually a little disappointing if you like that look for a Tamm Tamm is made when one buys a car, which costs "only" about 1 / 4 of the House ... Perhaps there is something else, finally, the house is not finished yet ;-)
This week is the outer wall planned for April and the paving work - until then, there are a few photos from inside the house:
Our kitchen (almost) cleared
More space = more storage space for odds and ends
The Hundeausguckfenster is finally used by the fur nose :-)
The living room also takes shape

Sunday, February 27, 2011

Women Bmi Breast Size

The first entry out of the house

We now have almost all the boxes unpacked, set up all the furniture and lamps mounted almost anywhere. Currently we are still struggling with the recurring dust and Hundetapsen. Dark tiles + rain + dogs = Many small mud tracks ... In Hardware
have then discovered by chance a Wischset by Leifheit . This wipes one (s) even volunteered the ground! ;-)
Here are some pictures of the current state:
warming party with our supporters
warming party with our supporters
living
living room

guest bathroom
bathroom upstairs
office

office

Wednesday, February 23, 2011

What Does It Mean When A Genital Wart Bleeds?

Who needs fan heater?

Since our heating now is yes, we do not need our heater. Anybody interested?

We have got the two pieces with 3.5 kw for each 99, - bought. The manufacturer's warranty still runs until December 2012. The boxes to send, we also have.

The two have made the building in winter possible. So who wants to build in this cold and still further: Please log in with an offer!

Monday, February 21, 2011

What Do You Call A Couch With A Bed

We're in. ...

... that was (almost) easy :-)
Many thanks to our helpers Jojo, Mark, Stephen, Andrew and Nadine! Now it is
remove boxes, furniture and building cleaning.

Wednesday, February 16, 2011

Message For Invitation For Griha Pravesh

construction cleaning - Only 1 day!

Today will take place tomorrow and then the construction cleaning house delivery - that are now determined from the longest 24 hours of our life be
:-) I think we were not even at the Uni-audit Sun anticipation and excitement * g *
Almost a year ago (27/02/2010) we have signed with Hannover House and now we are about our dream house to collect - it's an indescribable feeling.
There is still the outside wall, but we now have a guarantee to get over the remaining installments, so that guarantees that the rest will only be paid if the outer wall is attached.
yesterday have done the plumbing their remaining work and we We practiced in patches ;-)
shower
Bath
Professional paving work ;-)

Tuesday, February 15, 2011

The Lounge Abu Dhabi Haircut Charges

Only 2 days until the house delivery

days Only two to house delivery and the interior work is proceeding at full speed. In recent days, the stairs were mounted, internal doors fitted, advanced electrical installation continues and the tile has made the last base.
We were a bit busy and have a few lamps bolted to the ceiling (for the reinforced concrete ceiling We have two drill burns ...), a few larger furniture carried into the house and repainted and built here and there.
frosted glass door between the porch and staircase

Sunday, February 13, 2011

Era Laundry Detergent

Short Update

Hello readers,

here is a quick update of last week:

  • On Tuesday we took our two Bautockner in holding and that the "dehumidify" out now on.
  • On
  • Donnerstaf and Friday, the company Grünwald connected and that the EWP Estrichaufheizprogramm started. This will run two weeks and is powered completely on electricity. Then we get our heat then on the ground probes.
  • In parallel, the ground probes inserted into the utility room and the land was transformed to its original state.
  • Fischer has set on Friday the second transfer shaft, so that now all the house and drainage connections available and we are now totally independent of the weather.
  • On Saturday we went to IKEA and have you ever laminate, sinks, faucets, etc. purchased. That's
the moment too. In 1-2 weeks we will start with the fill (or begin to leave).

During the week there will also once again a picture update ...

Wednesday, February 9, 2011

Live View / - Axisminnesota

stairs where you are?

Since Monday should really be mounted the stairs, but they were not ... :-(
We're running the feeling that oral. Commitments and terminations in the construction industry are well handled differently than usual ... At least the tiler
was brave and has (as always) get the tiles etc., without stairs in the floor and continued his work.
'll see if that is done to Friday - @ our Site Manager: An information why, why, etc. .. this is not done would be nice!

Edit:
Our supervisor told us earlier by phone that the steps were installed today and what the next few days so everything happened. Also, the blower door test was passed with a value of 1.5 - some known to seal cracks, etc., the value should be even better. The Endreinigungstrupp was also already put on alert * g * The cleaner is already in the wings, waiting for good weather ... The weather forecast is unfortunately not so good ... From next week it is getting colder ;-(
Until Sunday, it looks quite good, but unfortunately no one working on WE ...

Monday, February 7, 2011

Offroad Fun Buggy Blue Prints

country as ...

Hello readers,

as with many other builders probably also had the weekend to land on our property. By the constant rain, a considerable Fützen has accumulated in front of our house.

home front
house back
Since set our civil contractors the delivery shaft for the rain water could not yet, is the rain through the downpipe just went to the ground and could not seep in volume. With the opening up of our lot is undermining the then civil contractors a small error. The prepayment of rain water connection has been set incorrectly, so that would have in this state, our delivery shaft on the neighboring property must be set. Because these so certainly would not have been agreed, he had to advance again, tearing half the street and pass the pre-stretching new. This was done last week and the second delivery shaft is then installed this week by Fischer and hopefully the downpipes connected.


delivery shaft awaiting installation

The strong wind has also made independent of our Baustellentoillette. Today was set up by the craftsmen again.



But there are still some good news. Today, our two current meters were installed in the house (1x Power, 1x heat pump), so that tomorrow we will finally two Bautrockner in operation. These are then run for 3 weeks and hopefully attract a lot of moisture out of the house.

addition, today also began to lay the pipes to the ESP in the house. Tomorrow should also be substantially completed.

Bleeding And Scabbing Inside The Nose

The paint is on it

weekend we have the stair railing in anthracite painted gray - was not so easy to be as no steps to the railing of the balance and thereby emphasize clever ... but it worked somehow :-)
Forecasts

After

Friday, February 4, 2011

How To Act Around Guy Friend

theme DSL

The City of Sehnde is regarding DSL, of course, not to undertake further tries something and we rather unloved and unwanted Wireless broadband will be no alternative because the construction area has no direct connection to the nearest cell tower. It would have to sacrifice someone and play relay station, which would cause additional costs and move to an adhesion contract would.
Furthermore, the city has failed even free registration required for LTE for broadband Competence Center of Lower Saxony to register ... Malicious gossip has been: What the farmer knows ... * Fg *
But let us re-Iltener not like, so that our neighbors were very active! It was a "rage" letter with all signatures of the residents handed over to the city and erected a sign at the entrance of the building area, maybe the press attention and can help us here? :-)


The slogan "Very close out" the way, is directly from the Hannover region / city Sehnde.

Sehnde city - "Very close out" Welcome to
Sehnde in the Hanover region. Only a quarter to a half-hour Hanover's city center, close to the Hannover Fair, has Sehnde in the lee of the big city life in the country "very close out there." [Quote ]

Sunday, January 30, 2011

Meat Recipes Using Natural Yoghurt

Fantastic beach house in the Caribbean

This 8-room house is located in Cabarete, Puerto Plata . Beside the pool, the property also has air conditioning, fitted kitchens and all necessary appliances (all included in price).

The location is absolutely fantastic - the house is located in a quiet street right on the beach . Both from within and from the terraces of the fantastic sea views or romantic winter sun can be found.


Further data on beach house in the Caribbean :

Purchase Price: 234,000.00 EUR
Rooms: 8.00
Liveable: 190,00 m²
Land area approximately: 993.00 m²
Bedrooms: 4 Bathrooms
: 3
Vacant from: Now you look

other properties in the Caribbean Sea View ?

[Bild-/Infoquelle: immobilienscout24.de]

Brent Corrigan Brent Everett Movies

laid carpet and final sprint!

The carpet was laid on Friday by the company Saré and gives the floor is now a completely different look. Similarly, in the week set up the partition wall in the bedroom and installed the sanitary objects. A "wow" effect we saw when looking into the utility room and the controlled ventilation system ... (See photo)
And now comes the final sprint of the building - a preliminary takeover next week, then have the craftsmen two weeks to unfinished matters and eliminate defects and the major decrease for 17 :-) Dated February
bathroom sanitary ware

Geiles piece of technology in the HWR =)
laid carpet
wall in the bedroom including TV connection ;-)
party balcony
look slow construction by


Saturday, January 29, 2011

Braided Leather Bracelet Wholesale

Impressions

Hello readers,

here are some current pictures, mitlerweile the scaffolding was removed:

We finally have a road sign, or great name?




light in the kitchen around 17:00