country as ... Hello readers,
as with many other builders probably also had the weekend to land on our property. By the constant rain, a considerable Fützen has accumulated in front of our house.
|
| home front |
|
| house back |
Since set our civil contractors the delivery shaft for the rain water could not yet, is the rain through the downpipe just went to the ground and could not seep in volume. With the opening up of our lot is undermining the then civil contractors a small error. The prepayment of rain water connection has been set incorrectly, so that would have in this state, our delivery shaft on the neighboring property must be set. Because these so certainly would not have been agreed, he had to advance again, tearing half the street and pass the pre-stretching new. This was done last week and the second delivery shaft is then installed this week by Fischer and hopefully the downpipes connected.
|
| delivery shaft awaiting installation | | |
The strong wind has also made independent of our Baustellentoillette. Today was set up by the craftsmen again.
But there are still some good news. Today, our two current meters were installed in the house (1x Power, 1x heat pump), so that tomorrow we will finally two Bautrockner in operation. These are then run for 3 weeks and hopefully attract a lot of moisture out of the house.
addition, today also began to lay the pipes to the ESP in the house. Tomorrow should also be substantially completed.
0 comments:
Post a Comment