Hello Readers,
the past week was very successful. Our Lord Eletrik Dörbandt has concluded with his boys pre-installation. On Thursday it was also the company Roland Green forest with us and has the Sanitärvorinstallation completed in a day. These parts also has a good reason ... at the current Monday the cleaners do join us, yay!
this purpose, the client got a little "homework". I'm supposed to do on Sunday night our heater again, that we get a little temperature in the house. The Inennenwände have come around to +4 ° C. Let's see if our house is well insulated really well.
The second task is to provide running water, at the current temperatures no easy task. Here I have taken up a grandiose idea of Azar and constructed with OSB boards, a small hut by the water supply. This is a 60W bulb and is insulated with rock wool. The lamp makes a beautiful warmth and the water does not freeze anymore.
| |
| The "water hut |
| |
| heat source: 60W incandescent |
Here now some pictures of work from last week:
| |
| bedroom |
| |
| view towards bedroom floor |
| |
| staircase |
| |
| Nursery 1 |
| |
| children a sight corridor |
| |
| store room floor |
| |
| installation wall bathroom floor |
| |
| toilet corner bathroom floor |
| |
| vent bathroom floor |
| |
| shower bathroom floor |
| |
| Here comes the tub out |
| |
| Sat cable (left) and TV connection kitchen (right) |
| |
| water supply kitchen |
| |
| cable channel for TV, electricity 2xSat, and 2x Cat |
| |
| cable salads HWR |
| |
| water supply guest bathroom |
| |
| kitchen electrics |
| |
| Steckoden in all the window frames |
| | ||
| threaded rods and cables for satellite boom | | |
0 comments:
Post a Comment